Casa – 12.8.13 Posted on December 7, 2013July 21, 2017 by patrice The tower just inside the front door only needs a roof to be complete. This is looking through the front door, you can see all the way to the Master Bedroom hallway. Wow, the bodega almost has walls, they are really adding this fast Gives you an idea how the work the beams to fit in place Just a little more over the Master bedroom and the structure for the roof will be complete. Posted in Cotacachi and tagged bajareque, Cotacachi, Ecuador, ramiro rangles, rammed earth, san miguel.