Casa 3.13.14 Posted on March 13, 2014July 21, 2017 by patrice the usual shot – we will make a movie of these when the house is complete (same spot every time) this is the glass for the pyramid – over the indoor patio the freezer has a new look – notice the barrel ceiling? metal frame for the pyramid over the indoor patio Dave’s office oh the Tiara is expanding yet again – this is over the back porch pyramid frame work & the dome over the entry skylights are in place down this hall the master bathroom glass for the pyramid details, details this is what will cover both domes interesting details on the wall going to the guest wing oh whats this .. we have an arch going to the back yard master bedroom bay window – with a fabulous view of the mountain view from the front the shower … well we have a rather cool walk in now I think arched window opening above the tub (not there yet) this is the new windows where the Master toilet is – Dave says he has a throne master bathroom – you are not going to believe how it looks the view into the master bedroom another view of the front entry Indoor Patio has a curve The Arch to the back yard is just about done and we have a new feature at the front door Mid week update…mostly work inside but what is that guy in the yellow doing? Posted in Cotacachi and tagged bajareque, Cotacachi, Ecuador, ramiro rangles, rammed earth, san miguel.